Skip to content

Projects

Filter by Market

Central Utility Plant Replacement Project P3

Pipeline Management Program FY 2020-21 – Phase 1

Digester Gas Flare System Improvements, Iron Sponge Treatment

Camp Pendleton Naval Hospital

LATC Intermodal Facility Modernization Project

Berth 200 Rail Yard – Site Utility Relocations/Installations

California State University San Bernardino Utility Infrastructure Upgrades

Century Regional Detention Facility Utility Replacement

Hermosa Domestic Water Distribution System Replacement – HM PH 1 & PH 2

Recycled Water System Development

I-405 Sepulveda Pass Widening

Avenue 62 Trunk Sewer Redesign and Rehabilitation Project

LAX Central Utility Replacement Project

Westside Subway Extension Project Advanced Utility Relocations – (Fairfax Station)

Valley Metro Light Rail Power Infrastructure Relocation

The Arbor Vitae Permanent Power Duct Bank

Beverly Glen Boulevard 34.5 KV and 4.8 KV Conduit Run Upgrades

SARI Relocation – Mainline (including Metering Station)

Los Osos Wastewater Collection System Project Areas B & C

Sewer Main Emergency Replacement

Termino Avenue Drain

San Jacinto Sewer Project Phase II

Joint Outfall “C” Unit I Relief Trunk Sewer, Phase II

Joint Outfall “C” Unit I Relief Trunk Sewer, Phase I

Multiyear Service Contract

Joint Water Pollution Control Plant Effluent Outfall Project

City Trunk Line South – Unit 3

City Trunk Line South Unit II

River Supply Conduit Improvement Upper Reach – Units 5 & 6

Station Water Treatment Implementation Project

Colorado River Aqueduct Rehabilitation

The Century Truck Line Unit 1 Phase 3

Perris Valley Pipeline – North Reach

North City Pure Water Pipeline, Subaqueous Pipeline, and AC Water Group 1038

Beach Club Road Low Water Crossing Project

Kern River Access Road Widening at Powerhouse #1 and Forebay Walkway Replacement

San Gabriel Reservoir Post-Fire Emergency / Sediment Removal Program

Tujunga Wash Spreading Grounds Enhancement Project

AT&T Catenary Support System Across Interstate 5 at Beach Boulevard

SR 91 HOV Project

California High Speed Train Project Construction Package 1- AT&T Duct Bank

Station Leak – Emergency Response

PCH Emergency Water System and Roadway Repair

12 kV Primary Electrical Damage Emergency Call Out

Carson 48-inch Trunk Sewer Leak

Archibald Pressure Betterment

Fuel Pipeline Relocation – Rosecrans Avenue

CPUC Mobile Home Park Utility Transfer Program

Barstow Bio / Renewable Diesel Project

DIMP Gas Service Replacement

Petroleum Pipeline Relocation – UPRR Alhambra Substation